NEW QUESTION # 41
What upgrade scenario required an upgrade of power supplies?

  • A. X50R2 > X50R3
  • B. X10 > X50
  • C. X50 > X70

Answer: B

Explanation:
Upgrading from FlashArray X10 to X50 requires upgrading power supplies to meet the higher power demands of the larger chassis and expanded hardware.


NEW QUESTION # 42
The customer has completed the installation document and has stated that the proxy server address is "10.24.18.120". What additional information is required?

  • A. Protocol prefix and port number
  • B. Protocol prefix and credentials
  • C. Credentials and port number

Answer: A

Explanation:
To properly configure the proxy server, both the protocol prefix (e.g., http:// or https://) and the port number are required along with the IP address.


NEW QUESTION # 43
An Implementation Engineer is assigned to install a 4X Module 9.1 TB Conversation Kit in a Flash Array Chassis. Why are there only four Direct Flash Modules?

  • A. To fill out enclosure bays.
  • B. To widen an existing write group.
  • C. To replace a missing shipment

Answer: B

Explanation:
Installing four DirectFlash Modules in a 9.1 TB Conversion Kit is intended to widen an existing write group, improving performance and capacity distribution within the FlashArray.


NEW QUESTION # 44
The Customer's Implementation Workbook specifies that the SMTP reply is "outlook.microsoft.com:587". What correction should be made for array initialization to be successful?

  • A. Provide username and password.
  • B. Remove the port number.
  • C. Prefix the URL with "https://".

Answer: B

Explanation:
For SMTP settings during array initialization, the host should be specified without the port number; including ":587" can cause connection issues and prevent successful initialization.


NEW QUESTION # 45
At the completion of an upgrade, which command is used to send phonehome logs?

  • A. purearray phonehome --send-today
  • B. purelogs --send-all
  • C. purearray phonehome --send-logs

Answer: C

Explanation:
The command purearray phonehome --send-logs is used to send all Phonehome logs to support upon completion of an upgrade.


NEW QUESTION # 46
When should a FlashArray support case be opened?

  • A. Once an issue arises
  • B. Before starting install
  • C. Once install is completed

Answer: B

Explanation:
Opening a support case before starting the installation ensures timely assistance and coordination with support throughout the deployment process.


NEW QUESTION # 47
What is the minimum AC voltage required to operate a FlashArray//X20R4 array?

  • A. 0
  • B. 1
  • C. 2

Answer: A

Explanation:
The FlashArray//X20R4 requires a minimum AC input voltage of 180V to operate. This ensures stable power delivery for the array's components.


NEW QUESTION # 48
An Implementation Engineer is performing a capacity consolidation on an X50R3.
Which command is needed for the engineer to determine whether the customer's FlashArray supports SAS Flash Modules?

  • A. purehw list --type drive --all
  • B. puredrive list --total --type controller
  • C. purehw list --type controller --all

Answer: A

Explanation:
This command reports every installed drive module, identifying SAS Flash Modules if present, whereas the other commands do not enumerate individual drive types.


NEW QUESTION # 49
What hardware should the Implementation Engineer find in the upgrade kit in order to perform an //X to //XL NDU?

  • A. 3 QSFP cables / 4 Mellanox cards / 10 DFMDs
  • B. 4 QSFP cables / 2 Mellanox cards / 20 DFMDs
  • C. 2 QSFP cables / 3 Mellanox cards / 20 DFMDs

Answer: C

Explanation:
The upgrade kit for an //X to //XL Non-Disruptive Upgrade (NDU) includes 2 QSFP cables, 3 Mellanox InfiniBand cards, and 20 DirectFlash Modules (DFMDs) to support new hardware connectivity and capacity requirements.


NEW QUESTION # 50
An Implementation Engineer is onsite to add two 4-port FC cards to a FlashArray//X20R3. In what state should the controller be in before performing the card add procedure?

  • A. Secondary
  • B. Primary
  • C. Standby

Answer: A

Explanation:
The controller should be in the Secondary state before adding FC cards to ensure the primary controller remains operational and the procedure can be performed safely without disrupting services.


NEW QUESTION # 51
When installing the first DirectFlash Shelf on a FlashArray//XR2/3, what mezzanine ports are used on the controllers?

  • A. ETH6 and ETH9
  • B. ETH6 and ETH8
  • C. ETH7 and ETH9

Answer: A

Explanation:
When installing the first DirectFlash Shelf on a FlashArray//XR2/3, mezzanine ports ETH6 and ETH9 on the controllers are used for connectivity.


NEW QUESTION # 52
A data pack has been installed and the puredrive list command shows the drives in "unadmitted" status. Which command should be used to complete the admission?

  • A. purearray drive admit
  • B. puredrive add
  • C. puredrive admit

Answer: C

Explanation:
The puredrive admit command is used to complete the admission process for drives showing as "unadmitted," integrating them fully into the FlashArray.


NEW QUESTION # 53
Support requests a powercycle on a newly-installed FlashArray. What is the correct way to perform this action?

  • A. Run purearray reboot.
  • B. Push the power button on each controller.
  • C. Unplug the cable on each power supply.

Answer: A

Explanation:
The proper and safe method to power cycle a FlashArray is to run the purearray reboot command, which gracefully restarts the system without risking data integrity or hardware issues.


NEW QUESTION # 54
Which default speed FC SFPs are shipped in FlashArray//XCR4 FC arrays?

  • A. 0
  • B. 1
  • C. 2

Answer: C

Explanation:
FlashArray//XCR4 arrays are shipped with 32Gb Fibre Channel (FC) SFPs by default. These 32Gb FC SFPs are capable of supporting 64Gb speeds, which can be enabled via a firmware upgrade. This allows the array to leverage higher-speed FC connections as needed.


NEW QUESTION # 55
What command will view NVRAM install and update status?

  • A. purehw list --all
  • B. puredrive list
  • C. purearray list

Answer: A

Explanation:
The command purehw list --all displays detailed hardware information, including NVRAM installation and update status on the FlashArray.


NEW QUESTION # 56
Which I/O card type is compatible across all FlashArray models?

  • A. iSCSI
  • B. 10GBaseT
  • C. FC

Answer: C

Explanation:
Fibre Channel (FC) I/O cards are compatible across all FlashArray models, providing consistent SAN connectivity regardless of array generation.


NEW QUESTION # 57
A customer would like to consolidate their SAS shelves and wants to evacuate multiple shelves in parallel. What is a prerequisite for this procedure?

  • A. Purity must be upgraded to 6.x
  • B. The array usage percentage must be lower than 60%
  • C. The array chassis must be fully populated with modules.

Answer: B

Explanation:
To evacuate multiple shelves in parallel safely during consolidation, the array's usage must be sufficiently low (under 60%) to ensure enough free capacity for data movement.


NEW QUESTION # 58
Before leaving the site after an install, who is required to provide completion sign-off?

  • A. Customer
  • B. Support
  • C. Account team

Answer: A

Explanation:
The customer's completion sign-off is required to confirm that the installation meets their expectations and requirements before the engineer leaves the site.


NEW QUESTION # 59
......


Pure Storage FlashArray-Implementation-Specialist Exam Syllabus Topics:

TopicDetails
Topic 1
  • Installation: This section of the exam measures the skills of Enterprise Infrastructure Technicians and focuses on executing a successful installation of FlashArray systems. It tests the ability to perform physical setup, cabling, configuration of network settings, and the application of initial system configurations necessary for full deployment.
Topic 2
  • Upgrades: This section of the exam measures the skills of FlashArray Implementation Specialists and focuses on tasks involved in managing firmware and software upgrades. Candidates must demonstrate knowledge of upgrade planning, verification steps, and rollback procedures, ensuring that systems are updated with minimal disruption to service.
Topic 3
  • Post-Installation
  • Upgrade: This section of the exam measures the skills of FlashArray Implementation Specialists and evaluates how professionals confirm system functionality after installation or an upgrade. It involves validating connectivity, running health checks, confirming configurations, and ensuring that the deployment meets operational expectations.
Topic 4
  • Pre-Installation
  • Upgrade: This section of the exam measures the skills of Enterprise Infrastructure Technicians and covers all preparation activities before deploying or upgrading a Pure Storage FlashArray. It includes understanding environmental requirements, verifying prerequisites, checking compatibility, and validating system readiness through appropriate tools and documentation.

 