NEW QUESTION # 32
You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles.
Which of the following SAP Signavio solutions can be used for the remodeling?
- A. SAP Signavio Process Governance
- B. SAP Signavio Process Insights
- C. SAP Signavio Process Manager
- D. SAP Signavio Process Intelligence
Answer: C
NEW QUESTION # 33
How do you model a production line in repetitive manufacturing?
- A. As a resource network
- B. As an operation
- C. As a work center
- D. As a routing
Answer: C
NEW QUESTION # 34
Which operations are considered in the capacity scheduling table?
Note: There are 2 correct answers to this question.
- A. Only bottleneck operations
- B. Sub-operations
- C. Operations assigned to a pacemaker work center
- D. All operations
Answer: A,B
NEW QUESTION # 35
How do you assign resources in a master recipe with operations and phases?
- A. You assign resources to the operations.
- B. You assign resources to the header of the master recipe.
- C. You assign resources to the sub-operations.
- D. You assign resources to the phases.
Answer: A
NEW QUESTION # 36
What are some benefits of planning with planned independent requirements for finished materials?
Note: There are 2 correct answers to this question.
- A. You have the option to use forecast planning.
- B. The delivery time is reduced.
- C. Manufacturing time for final assembly is reduced.
- D. You have the option to use make-to-order production.
Answer: A,D
NEW QUESTION # 37
What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question.
- A. The production version must NOT be deleted.
- B. The production quantity must lie within the lot-size range of the production version.
- C. The production quantity must only lie within the lot-size range of the routing in the production version.
- D. The basic start date of the order must lie within the validity period of the production version.
- E. The basic end date of the order must lie within the validity period of the production version.
Answer: B,C,D
NEW QUESTION # 38
Which alternative item strategies are available in bills of material (BOMs)?
Note: There are 2 correct answers to this question.
- A. Simultaneous
- B. Manual maintenance
- C. Ranking
- D. 100% check
Answer: B,D
NEW QUESTION # 39
During production order creation, several valid production versions are found.
How does the system choose the production version?
- A. Lot size or material cost
- B. Alphanumeric or quota arrangement
- C. Validity period or sales order
- D. Planned order or material number
Answer: B
NEW QUESTION # 40
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question.
- A. Select a special explosion type inside the material BOM (bill of material)
- B. Select a special explosion type inside the material master
- C. Select a special procurement type inside the material master
- D. Select a special procurement type inside the material BOM (bill of material)
Answer: C,D
NEW QUESTION # 41
Which settings can you make in a production scheduling profile?
Note: There are 3 correct answers to this question.
- A. Automatic print on order creation
- B. Automatic goods receipt on confirmation
- C. Automatic release on order creation
- D. Automatic goods issue on confirmation
- E. Default order types
Answer: B,C,E
NEW QUESTION # 42
In the bucket planning mode of the capacity scheduling table, what happens if the sum of the requirements of all operations exceeds the available capacity of the bucket?
- A. The operation is rescheduled to an alternative work center.
- B. The operation CANNOT be dispatched.
- C. The operation is rescheduled backwards.
- D. The operation is rescheduled in the planning direction.
Answer: D
NEW QUESTION # 43
In which master data objects do you maintain data to determine the duration of an operation for production?
Note: There are 2 correct answers to this question.
- A. Production version
- B. Work center
- C. Material master
- D. Routing
Answer: B,D
NEW QUESTION # 44
Which time elements are relevant for lead time scheduling of a production order?
Note: There are 2 correct answers to this question.
- A. Total replenishment lead time
- B. Float after production
- C. Setup time
- D. Opening period
Answer: B,C
NEW QUESTION # 45
Which of the following are features of the clean core dashboard?
Note: There are 2 correct answers to this question.
- A. Customers can use the dashboard in the dev, test, and production tenants.
- B. It can be used in all SAP S/4HANA Cloud editions.
- C. Customers can grant access to the dashboard to partners.
- D. It can be accessed by using SAP For Me.
Answer: C,D
NEW QUESTION # 46
What data can you maintain in the items detail screen of a bill of material (BOM)?
Note: There are 2 correct answers to this question.
- A. Lot size
- B. Co-product
- C. Change number
- D. Alternative item group
Answer: B,D
NEW QUESTION # 47
What are some options for creating production orders without using trigger points?
Note: There are 2 correct answers to this question.
- A. In assembly production, confirmation of scrap triggers the creation of a production order
- B. In assembly production, a sales order triggers the creation of a production order
- C. In make-to-stock production, confirmation of yield for sub-assembly triggers the creation of a production order
- D. In make-to-stock production, you can manually create production orders
Answer: B,D
NEW QUESTION # 48
When does the system trigger replenishment for a Kanban container?
- A. When you set the container to Waiting
- B. When you set the container to Empty
- C. When you set the container to Full
- D. When you set the container to In transit
Answer: B
NEW QUESTION # 49
Your production planners are supposed to execute planning only for specific resources. What do you use to achieve this in Advanced Planning (PP/DS)?
- A. A planning group
- B. A planning area
- C. A work center hierarchy
- D. A propagation range
Answer: A
NEW QUESTION # 50
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.
- A. Storage location MRP areas are required to manage sales-order-specific stock.
- B. Planned orders are created in MRP with reference to sales orders.
- C. Production and procurement costs are managed on the sales order item level.
- D. Net requirements calculation is carried out for every sales order individually.
- E. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.
Answer: B,C,D
NEW QUESTION # 51
Which order type is used for repetitive manufacturing?
- A. Planned order
- B. Process order
- C. Kanban order
- D. Production order
Answer: A
NEW QUESTION # 52
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question.
- A. Material type
- B. Procurement type
- C. MRP type
- D. MRP group
Answer: B,C
NEW QUESTION # 53
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you choose in SAP S/4HANA to track and use this information in all areas of logistics?
- A. Engineering change management
- B. Batch management
- C. Quality management
- D. Process order management
Answer: B