[Nov 10, 2025] Get to the Top with C_TS422_2504 Practice Exam Questions [Q32-Q54]

Share

[Nov 10, 2025] Get to the Top with C_TS422_2504 Practice Exam Questions

Use Real C_TS422_2504 Dumps Free Sample Questions and Practice Test Engine

NEW QUESTION # 32
You are a consultant on an SAP S/4HANA Cloud brownfield project. In a meeting the customer decides to remodel an existing business process in accordance with clean core principles.
Which of the following SAP Signavio solutions can be used for the remodeling?

  • A. SAP Signavio Process Governance
  • B. SAP Signavio Process Insights
  • C. SAP Signavio Process Manager
  • D. SAP Signavio Process Intelligence

Answer: C


NEW QUESTION # 33
How do you model a production line in repetitive manufacturing?

  • A. As a resource network
  • B. As an operation
  • C. As a work center
  • D. As a routing

Answer: C


NEW QUESTION # 34
Which operations are considered in the capacity scheduling table?
Note: There are 2 correct answers to this question.

  • A. Only bottleneck operations
  • B. Sub-operations
  • C. Operations assigned to a pacemaker work center
  • D. All operations

Answer: A,B


NEW QUESTION # 35
How do you assign resources in a master recipe with operations and phases?

  • A. You assign resources to the operations.
  • B. You assign resources to the header of the master recipe.
  • C. You assign resources to the sub-operations.
  • D. You assign resources to the phases.

Answer: A


NEW QUESTION # 36
What are some benefits of planning with planned independent requirements for finished materials?
Note: There are 2 correct answers to this question.

  • A. You have the option to use forecast planning.
  • B. The delivery time is reduced.
  • C. Manufacturing time for final assembly is reduced.
  • D. You have the option to use make-to-order production.

Answer: A,D


NEW QUESTION # 37
What are prerequisites for a production version to be selected for a production order? Note: There are 3 correct answers to this question.

  • A. The production version must NOT be deleted.
  • B. The production quantity must lie within the lot-size range of the production version.
  • C. The production quantity must only lie within the lot-size range of the routing in the production version.
  • D. The basic start date of the order must lie within the validity period of the production version.
  • E. The basic end date of the order must lie within the validity period of the production version.

Answer: B,C,D


NEW QUESTION # 38
Which alternative item strategies are available in bills of material (BOMs)?
Note: There are 2 correct answers to this question.

  • A. Simultaneous
  • B. Manual maintenance
  • C. Ranking
  • D. 100% check

Answer: B,D


NEW QUESTION # 39
During production order creation, several valid production versions are found.
How does the system choose the production version?

  • A. Lot size or material cost
  • B. Alphanumeric or quota arrangement
  • C. Validity period or sales order
  • D. Planned order or material number

Answer: B


NEW QUESTION # 40
How can you set up a material as a phantom assembly?
Note: There are 2 correct answers to this question.

  • A. Select a special explosion type inside the material BOM (bill of material)
  • B. Select a special explosion type inside the material master
  • C. Select a special procurement type inside the material master
  • D. Select a special procurement type inside the material BOM (bill of material)

Answer: C,D


NEW QUESTION # 41
Which settings can you make in a production scheduling profile?
Note: There are 3 correct answers to this question.

  • A. Automatic print on order creation
  • B. Automatic goods receipt on confirmation
  • C. Automatic release on order creation
  • D. Automatic goods issue on confirmation
  • E. Default order types

Answer: B,C,E


NEW QUESTION # 42
In the bucket planning mode of the capacity scheduling table, what happens if the sum of the requirements of all operations exceeds the available capacity of the bucket?

  • A. The operation is rescheduled to an alternative work center.
  • B. The operation CANNOT be dispatched.
  • C. The operation is rescheduled backwards.
  • D. The operation is rescheduled in the planning direction.

Answer: D


NEW QUESTION # 43
In which master data objects do you maintain data to determine the duration of an operation for production?
Note: There are 2 correct answers to this question.

  • A. Production version
  • B. Work center
  • C. Material master
  • D. Routing

Answer: B,D


NEW QUESTION # 44
Which time elements are relevant for lead time scheduling of a production order?
Note: There are 2 correct answers to this question.

  • A. Total replenishment lead time
  • B. Float after production
  • C. Setup time
  • D. Opening period

Answer: B,C


NEW QUESTION # 45
Which of the following are features of the clean core dashboard?
Note: There are 2 correct answers to this question.

  • A. Customers can use the dashboard in the dev, test, and production tenants.
  • B. It can be used in all SAP S/4HANA Cloud editions.
  • C. Customers can grant access to the dashboard to partners.
  • D. It can be accessed by using SAP For Me.

Answer: C,D


NEW QUESTION # 46
What data can you maintain in the items detail screen of a bill of material (BOM)?
Note: There are 2 correct answers to this question.

  • A. Lot size
  • B. Co-product
  • C. Change number
  • D. Alternative item group

Answer: B,D


NEW QUESTION # 47
What are some options for creating production orders without using trigger points?
Note: There are 2 correct answers to this question.

  • A. In assembly production, confirmation of scrap triggers the creation of a production order
  • B. In assembly production, a sales order triggers the creation of a production order
  • C. In make-to-stock production, confirmation of yield for sub-assembly triggers the creation of a production order
  • D. In make-to-stock production, you can manually create production orders

Answer: B,D


NEW QUESTION # 48
When does the system trigger replenishment for a Kanban container?

  • A. When you set the container to Waiting
  • B. When you set the container to Empty
  • C. When you set the container to Full
  • D. When you set the container to In transit

Answer: B


NEW QUESTION # 49
Your production planners are supposed to execute planning only for specific resources. What do you use to achieve this in Advanced Planning (PP/DS)?

  • A. A planning group
  • B. A planning area
  • C. A work center hierarchy
  • D. A propagation range

Answer: A


NEW QUESTION # 50
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What are the impacts of this decision?
Note: There are 3 correct answers to this question.

  • A. Storage location MRP areas are required to manage sales-order-specific stock.
  • B. Planned orders are created in MRP with reference to sales orders.
  • C. Production and procurement costs are managed on the sales order item level.
  • D. Net requirements calculation is carried out for every sales order individually.
  • E. Sales orders have to be ATP-confirmed (available-to-promise) to be saved.

Answer: B,C,D


NEW QUESTION # 51
Which order type is used for repetitive manufacturing?

  • A. Planned order
  • B. Process order
  • C. Kanban order
  • D. Production order

Answer: A


NEW QUESTION # 52
Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question.

  • A. Material type
  • B. Procurement type
  • C. MRP type
  • D. MRP group

Answer: B,C


NEW QUESTION # 53
Your company manufactures materials whose characteristics differ for each manufacturing process.
Which application do you choose in SAP S/4HANA to track and use this information in all areas of logistics?

  • A. Engineering change management
  • B. Batch management
  • C. Quality management
  • D. Process order management

Answer: B


NEW QUESTION # 54
......

Pass SAP C_TS422_2504 exam - questions - convert Tets Engine to PDF: https://vcetorrent.examtorrent.com/C_TS422_2504-prep4sure-dumps.html